Composite Skill LabAI & Robotics LabAtal Tinkering LabNEP 2020 · Inspection-ready

A room full of equipment is not a lab.

We design the space, choose kits that survive real classrooms, install and commission everything, hand your inspector a binder, and then stay, because a lab is only alive while someone keeps it that way.

We visit, measure, and send a layout plan and costed proposal, usually within a week.

The enemy

Every district has one: the dead lab.

You have seen it. Maybe you have inherited it. It always dies the same three ways.

Cause of death 01

Kits in cupboards. Equipment bought to a spec sheet, never matched to a curriculum, locked away so nothing breaks. Nothing breaks. Nothing gets built either.

Cause of death 02

The vendor who vanished. Installed from a metro, invoiced, gone. The first servo fails in August; the phone stops answering in September.

Cause of death 03

Paperwork nobody owns. The ATL report unfiled, the utilisation log blank, the inspection binder that does not exist. Grants and affiliations follow the paperwork.

Our entire setup service is engineered against these three. Design for use. Support from next door. Compliance built in.

The blueprints

Three labs. Pick your wall to knock on.

Every room we build starts as a drawing like this. Tap a zone, or its legend, to see what happens there. These are illustrative layouts; yours is drawn from your actual room, after the survey.

Composite Skill Lab

CBSE · affiliation-linked600 sq ft (or 2 × 400)Classes 6–12
Drawing 01 / 03 · Composite Skill LabScale 1:50 · Illustrative
DOORDry Zone — Electronics & ITDRY ZONEWet Zone — Skill SectorsWET ZONEInstruction & Demo AreaINSTRUCTStorage WallSTORAGESafety StationSAFETY30 ft20 ft

Zone legend — tap to highlight

Answers: the CBSE Composite Skill Lab requirement, a prerequisite for new affiliation, with the window for existing schools closing Aug 2027.

Sector zones are chosen with you, matched to your teachers, your context and nearby vocations.Draw mine from my real room

In every build

Six things we never skip

One proposal, one partner, one invoice. We do not hand you a shopping list and disappear.

01

Site survey & 3D layout

We measure your room and plan benches, power points, storage and movement paths so a full batch of thirty builds at once, without queueing for a socket.

02

Kits that survive classrooms

Hardware picked for durability and repairability, not the spec sheet, with spares available locally, in the ratios your board prescribes.

03

Safety-first build

Tool storage, cable management, ventilation for soldering and printing, age-appropriate zoning, documented and handed over in writing.

04

The compliance binder

Layout drawings, equipment registers, safety procedures and utilisation logs, the file your CBSE inspector or ATL reviewer actually asks for, ready on day one.

05

Teacher handover

Your staff trained on every machine before students touch it, a printed operating manual, and a WhatsApp line straight to our engineers.

06

Maintenance & upgrades

Scheduled servicing, consumable restocking and a yearly review, so the lab grows with your students instead of gathering dust by year two.

Budgets are real

Start where you are. We design for what is next.

Phase 0 · No spare room?

The Robotics Trolley

A mobile lab that rolls between classrooms: kits, tools and charging on wheels. Real building starts this term, no construction required.

0 sq ft dedicated
Phase 1 · One spare classroom

The Starter Lab

A 150 to 200 sq ft room serving batches of twenty. Workbenches, core kits, storage, wired and zoned so Phase 2 slots in without redoing anything.

150–200 sq ft
Phase 2 · The full build

The Mandate-Grade Lab

Composite Skill Lab, AI & Robotics Lab or ATL at full specification: inspection-ready, curriculum-loaded, teacher-trained.

400–600+ sq ft

Every proposal comes at three budget levels, and the kits are modular, so nothing you buy in year one becomes redundant in year three.

How it works

From empty room to first build

  1. 1

    Site survey

    We visit, measure the room, and understand your grades, batch sizes, board obligations and budget.

    Free · ~2 hours
  2. 2

    Design & proposal

    A layout plan, an equipment list and a costed proposal at three budget levels.

    Within a week
  3. 3

    Install & commission

    We deliver, assemble and test everything on site, scheduled into breaks wherever possible.

    Weeks, not terms
  4. 4

    Train & hand over

    Teachers oriented on every machine, manual and compliance binder handed over, first classes launched.

    Before students enter
  5. 5

    Run & maintain

    Scheduled servicing, consumable restocking, utilisation support and a yearly review.

    All year, every year

Before you get in touch

Fair questions, straight answers

How much space do we need?

A spare classroom of 150 to 200 sq ft runs a starter lab for batches of twenty. CBSE's Composite Skill Lab norm is 600 sq ft for Classes 6 to 12 (or two 400 sq ft labs). No spare room at all? Start with the trolley: it moves between classrooms and nothing about it is wasted when a room opens up.

What does a lab cost?

It depends entirely on scale: a mobile trolley and a 600 sq ft Composite Skill Lab are different projects. After the free survey you get an itemised proposal at three budget levels, so you decide what to start with and what to phase in. We never quote before we have seen the room; be wary of anyone who does.

We already have a computer lab or an old kit cupboard. Does that count?

Often, yes, and it can save you serious money. CBSE allows an existing IT lab to be leveraged for coding and AI skill subjects, and an ATL for electronics. Part of the survey is auditing what you already own against what your mandate actually requires, before you spend a rupee.

Do you support Atal Tinkering Labs?

End to end: application support, GeM-compliant procurement against the AIM equipment list, installation, and the part vendors abandon: the monthly reports, mentoring records and competition pipeline the ₹20-lakh grant requires for five years. We can also run the weekly sessions that keep utilisation reporting healthy.

Who maintains the equipment?

We do, under an annual maintenance contract: scheduled servicing, repairs, spares and consumables. Your teachers never chase a vendor, because the vendor is a drive away in Naharlagun, not a flight away in a metro.

Can we start small and expand later?

Most schools do exactly that. We design the room so Phase 1 leaves the space, power and storage for what comes next, and the kits are modular, so nothing you buy in year one becomes redundant in year three.